All new laboratory equipment was installed including 15 fume hoods with Venturi controls. Coordination between mechanical, electrical, and plumbing was extremely well-planned in this very small space. The building remained occupied throughout leovegas casino reviewthe project. Noise and vibration were tightly controlled due to ongoing experiments and sensitive equipment in adjacent labs.